Project Description
3D models of 22 bridges along E22 between Sätaröd and Vä
The Swedish Transport Administration, Trafikverket, is redirecting the E22 motorway north of Tollarp, between Sätaröd and Vä, to reduce traffic in the area. The new section of the motorway will be 15 km long and includes 26 new bridges.
For the consultant, Centerlöf & Holmberg, CN3 has prepared 3D models for the concrete geometry, based on 2D design drawings, which has ensured that the authorities’ requirements were met. CN3 also carried out a design review of the consultant’s design basis in a 3D consistency analysis, which ensured coherent project material. By using scripts, much of this process was automated, saving both time and resources.
REFERENCE DATA
CLIENT: Trafikverket
ENGINEER: Centerlöf & Holmberg
CONTRACTOR: PEAB
PHASE: Design
SERVICES
Advanced modeling